Planning and compliance

Planning Energy Statement versus Building Regulations calculations

Why a planning report, SAP calculation, SBEM model and BRUKL report may support the same project without being the same deliverable.

Two approval systems, different questions

A planning Energy Statement explains how a development responds to the relevant local planning policy and the energy strategy presented with the application. Building Regulations calculations demonstrate compliance with the applicable technical requirements under Part L.

Approval under one system does not automatically satisfy the other. A project may receive planning permission with an energy commitment that must later be developed and evidenced through detailed design and compliance calculations.

What the planning statement normally does

The report identifies the policy requirement, describes the proposal and follows the energy hierarchy: reduce demand, supply energy efficiently and consider suitable low-carbon or renewable measures. It may use early SAP or SBEM results to quantify the strategy where the policy or brief requires this.

The scope can also include wider sustainability topics, but specialist conclusions on ecology, drainage, flood risk, transport or landscape should come from the appropriate project information and consultants.

What SAP, SBEM and BRUKL do

SAP is used for dwelling calculations under the relevant approved methodology. For non-domestic buildings, SBEM or an approved dynamic simulation route models energy performance within the National Calculation Methodology; the BRUKL report records the Part L compliance results.

These calculations require more detailed geometry, fabric, glazing, airtightness, lighting, services, controls and renewable-system inputs than may be fixed at early planning stage. Final as-built outputs must reflect the completed specification rather than the original planning assumptions.

Coordinate the reports from the beginning

The planning strategy should be achievable by the technical design, and later substitutions should be checked against both planning commitments and Building Regulations performance. Keep a schedule of assumptions, target reductions and evidence ownership so the project team knows what remains provisional.

Before commissioning, send the planning validation requirement, local policy, current drawings, floor areas, use, project programme and any existing calculations. The adviser can then confirm whether the immediate need is a planning statement, a compliance calculation or a coordinated package.

Official sources