Scan-to-BIM

Measured survey to Scan-to-BIM: what should an architect request?

How to specify point clouds, drawings and Revit deliverables so the resulting model contains the right information for the project.

Begin with the decisions the model must support

Scan-to-BIM converts measured observations into a structured digital representation of the existing building. The brief should state whether the output is for feasibility, planning, coordination, detailed design, asset information or another defined purpose.

Requesting “a Revit model” or a generic LOD does not fully define the deliverable. The architect should identify the geometrical information, alphanumerical information and documentation needed for the intended decisions.

Specify the survey foundation

Confirm the survey extent, target accuracy, inaccessible areas, control network, datum and coordinate system. State whether external grounds, roofs, façades, neighbouring context, visible services or structure above ceilings are required.

The point cloud is evidence of captured surfaces, not a guarantee that every object will be converted into a model element. Occlusion, reflective materials, movement and restricted access should be recorded and resolved through additional observations or agreed limitations.

Define the model content

List the elements to be modelled: walls, floors, roofs, openings, stairs, columns, beams, ceilings, sanitary fittings, fixed furniture, visible services and site features as applicable. State how irregular or historic fabric should be represented and the tolerance for simplified geometry.

Also confirm required levels, grids, room information, shared coordinates, classification, naming and parameters. If IFC export or coordination with other authoring software is required, agree the version and exchange test before final delivery.

Agree outputs and quality checks

A useful package may include the registered point cloud, Revit model, PDF or DWG plans, elevations and sections, plus a survey limitations note. File versions, origin, units and responsibility for hosting large datasets should be agreed in advance.

The model should be reviewed against the agreed information requirements, not judged by visual complexity alone. The UK BIM Framework emphasises defining the purpose and the level of information need so the project receives sufficient information without producing waste.

Need advice for a specific building or project?

Discuss a Scan-to-BIM brief
Privacy