Start with the building and its uses
An SBEM model begins with the building geometry and activity zoning. Provide current floor plans, sections and elevations, floor-to-floor and ceiling heights, orientation, areas and a clear description of how each space will be used.
Open-plan offices, meeting rooms, circulation, toilets, storage, retail, workshops and other activities may require different model zones. Room names alone are not always enough: occupancy, schedules and environmental conditions should match the intended use.
Fabric and openings
The assessor needs the wall, roof and floor build-ups, U-values or sufficient material data to calculate them, thermal-mass information where relevant and the proposed air-permeability target. Exposed and unconditioned boundaries must be clear on the drawings.
For windows, rooflights and glazed doors, provide dimensions or schedules together with U-values, solar transmittance, light transmittance, frame information and shading where available. Unsupported defaults can materially change the result.
Building services and lighting
Provide the heating, cooling, ventilation and hot-water system types, efficiencies, fuel or energy source, distribution, controls and zoning. Manufacturer data and coordinated schedules are more useful than a general statement such as “heat pump” or “mechanical ventilation”.
The lighting input requires luminaire performance and control information for the relevant zones. Occupancy sensing, daylight control and time control should only be included when they are part of the coordinated design.
Renewables, evidence and project stage
For photovoltaic systems, provide the proposed capacity, orientation, inclination, overshading and inverter information. Other low-carbon systems need equivalent design data that can be supported by the project specification.
At design stage, record assumptions and update them as the design changes. At as-built stage, confirm the installed products, commissioning results, air-test information and every relevant departure from the design model. A clear evidence trail makes the final BRUKL report faster to complete and easier to verify.